Staple Feed and Driver
AssemblyVibration-fed staple magazine and solenoid-driven punch that drives U-shaped staples through bristle anchor points for permanent locking. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Staple Feed and Driver parts and their functions
5 top-level parts · 5 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Staple Bowl Feeder | 1× | Bowl vibration feeder for loose staples |
| 2 | Staple Impact Punch | 1× | Solenoid-driven impact punch with 2–3 cm stroke |
| 3 | Staple Anvil Die | 1× | Hardened steel anvil die matching staple geometry |
| 4 | Connector | 1× | Solenoid coil and trigger valve harness |
| 5 | O-Ring Set | 1× | Punch rod seal and wear rings |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Staple Feed and Driver
5 top-level lines · 5 rows shown · 5 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Staple Bowl Feeder | toothbrush-tufting-machine-staple-hopper | 1× | 1 | · | part |
| 2 | Staple Impact Punch | toothbrush-tufting-machine-staple-punch | 1× | 1 | · | part |
| 3 | Staple Anvil Die | toothbrush-tufting-machine-staple-die | 1× | 1 | · | part |
| 4 | Connector | connector | 1× | 1 | · | part |
| 5 | O-Ring Set | oring-set | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the staple feed and driver is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |