BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Water Box

Assembly

The sealed chamber against the die face where the cutting happens, flooded with water that quenches and carries the pellets away. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Water Box parts and their functions

5 top-level parts · 5 parts in total · full bill of materials below
Water Box parts diagram: 1 box housing, 2 water inlet, 3 pellet outlet, 4 box seal, 5 box clamp. 5 parts in 5 top-level items.
Water Box parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Box Housing 1× Cutting chamber housing
2 Water Inlet 1× Tangential water inlet
3 Pellet Outlet 1× Pellet slurry outlet
4 Box Seal 1× Face seal
5 Box Clamp 1× Quick-release clamp

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Water Box

5 top-level lines · 5 rows shown · 5 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Box Housing uwp-box-housing 1× 1 · part
2 Water Inlet uwp-water-inlet 1× 1 · part
3 Pellet Outlet uwp-pellet-outlet 1× 1 · part
4 Box Seal uwp-box-seal 1× 1 · part
5 Box Clamp uwp-clamp 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the water box is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks