BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Water Cooling System

Assembly

Circulating coolant jacket around crucible and vacuum chamber, rejecting arc heat. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Water Cooling System parts and their functions

5 top-level parts · 5 parts in total · full bill of materials below
Water Cooling System parts diagram: 1 cooling water pump, 2 cooling tower heat exchanger, 3 cooling temperature control valve, 4 cooling flow meter, 5 water supply filter. 5 parts in 5 top-level items.
Water Cooling System parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Cooling Water Pump 1× 3 kW pump circulating ~100 LPM at 3 bar
2 Cooling Tower Heat Exchanger 1× Air-cooled heat exchanger rejecting ~60 kW
3 Cooling Temperature Control Valve 1× 3-way valve maintaining return water at 20–25 °C
4 Cooling Flow Meter 1× Turbine flowmeter monitoring cooling rate
5 Water Supply Filter 1× 5 µm strainer protecting pump impellers

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Water Cooling System

5 top-level lines · 5 rows shown · 5 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Cooling Water Pump vacuum-arc-remelting-furnace-cooling-pump 1× 1 · part
2 Cooling Tower Heat Exchanger vacuum-arc-remelting-furnace-cooling-tower 1× 1 · part
3 Cooling Temperature Control Valve vacuum-arc-remelting-furnace-cooling-thermostatic-valve 1× 1 · part
4 Cooling Flow Meter vacuum-arc-remelting-furnace-flow-meter 1× 1 · part
5 Water Supply Filter vacuum-arc-remelting-furnace-water-filter 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the water cooling system is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks