Water-Wash Arrestance System
AssemblyWater curtain and venturi scrubber that capture paint solids from the extract air. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Water-Wash Arrestance System parts and their functions
6 top-level parts · 105 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Water Curtain | 1× | Back-wall water curtain weir plate |
| 2 | Venturi Throat | 4× | Venturi throats accelerating air through water |
| 3 | Wash Recirculation Pump 5 parts | 2× | Recirculation pumps feeding the curtain and venturi |
| 4 | Sludge Tank | 1× | Settling tank collecting paint sludge |
| 5 | Sludge Rake Conveyor 5 parts | 1× | Surface rake conveyor removing floated sludge |
| 6 | Detackifier Doser | 1× | Chemical dosing pump for paint detackifier |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Water-Wash Arrestance System
6 top-level lines · 24 rows shown · 105 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Water Curtain | conveyor-paint-booth-water-curtain | 1× | 1 | · | part |
| 2 | Venturi Throat | conveyor-paint-booth-venturi-throat | 4× | 4 | · | part |
| 3 | Wash Recirculation Pump 5 parts | conveyor-paint-booth-wash-pump | 2× | 2 | 29 | assembly |
| 3.1 | Servo Motor 4 parts | servo-motor | 1× | 2 | 24 | assembly |
| 3.1.1 | Stator Assembly 3 parts + deeper › | stator-assembly | 1× | 2 | 3 | assembly |
| 3.1.2 | Rotor Assembly 4 parts + deeper › | rotor-assembly | 1× | 2 | 19 | assembly |
| 3.1.3 | Encoder | encoder | 1× | 2 | · | part |
| 3.1.4 | Motor Housing | motor-housing | 1× | 2 | · | part |
| 3.2 | Pump Impeller | conveyor-paint-booth-pump-impeller | 1× | 2 | · | part |
| 3.3 | Mechanical Seal | conveyor-paint-booth-mechanical-seal | 1× | 2 | · | part |
| 3.4 | Ball Bearing | ball-bearing | 2× | 4 | · | part |
| 3.5 | Pump Casing | conveyor-paint-booth-pump-casing | 1× | 2 | · | part |
| 4 | Sludge Tank | conveyor-paint-booth-sludge-tank | 1× | 1 | · | part |
| 5 | Sludge Rake Conveyor 5 parts | conveyor-paint-booth-sludge-rake | 1× | 1 | 40 | assembly |
| 5.1 | Servo Motor 4 parts | servo-motor | 1× | 1 | 24 | assembly |
| 5.1.1 | Stator Assembly 3 parts + deeper › | stator-assembly | 1× | 1 | 3 | assembly |
| 5.1.2 | Rotor Assembly 4 parts + deeper › | rotor-assembly | 1× | 1 | 19 | assembly |
| 5.1.3 | Encoder | encoder | 1× | 1 | · | part |
| 5.1.4 | Motor Housing | motor-housing | 1× | 1 | · | part |
| 5.2 | Gearbox Housing | gearbox-housing | 1× | 1 | · | part |
| 5.3 | Helical Gear Pair | gear-pair | 1× | 1 | · | part |
| 5.4 | Rake Flight | conveyor-paint-booth-rake-flight | 12× | 12 | · | part |
| 5.5 | Ball Bearing | ball-bearing | 2× | 2 | · | part |
| 6 | Detackifier Doser | conveyor-paint-booth-detackifier-doser | 1× | 1 | · | part |
Where the water-wash arrestance system is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |