Charging System
AssemblyAutomated skip hoist and bell-type charging valves metering metal and coke into the furnace. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Bill of materials for Charging System
5 top-level lines as of r41714| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Charging Door | cupola-furnace-charging-door | 1× | 1 | · | part |
| 2 | Skip Hoist Motor and Drum | cupola-furnace-skip-hoist | 1× | 1 | · | part |
| 3 | Charging Bucket | cupola-furnace-charge-bucket | 1× | 1 | · | part |
| 4 | Primary Charging Bell Valve | cupola-furnace-bell-valve-top | 1× | 1 | · | part |
| 5 | Secondary Bell and Drip Spout | cupola-furnace-secondary-bell | 1× | 1 | · | part |