BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Air Knife Section

Assembly

Pairs of gas jets just above the bath that blow excess molten zinc back into the pot, setting the coating weight precisely and evenly across the width. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Air Knife Section parts and their functions

5 top-level parts · 92 parts in total · full bill of materials below
Air Knife Section parts diagram: 1 air knife header, 2 air knife blower, 3 knife positioner, 4 coating weight gauge, 5 edge baffle. 92 parts in 5 top-level items.
Air Knife Section parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Air Knife Header 3 parts 2× Slot nozzle headers wiping each face
2 Air Knife Blower 3 parts 1× High-pressure blower feeding the knives
3 Knife Positioner 3 parts 1× Actuators setting knife gap and height
4 Coating Weight Gauge 3 parts 1× X-ray gauge reading live coating weight
5 Edge Baffle 2× Edge baffles trimming over-coat at the edges

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Air Knife Section

5 top-level lines · 25 rows shown · 92 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Air Knife Header 3 parts galvanizing-line-knife-header 2× 2 4 assembly
1.1 Knife Lip galvanizing-line-knife-lip 2× 4 · part
1.2 Knife Plenum galvanizing-line-knife-plenum 1× 2 · part
1.3 Fastener Set fastener-set 1× 2 · part
2 Air Knife Blower 3 parts galvanizing-line-knife-blower 1× 1 27 assembly
2.1 Servo Motor 4 parts servo-motor 1× 1 24 assembly
2.1.1 Stator Assembly 3 parts + deeper › stator-assembly 1× 1 3 assembly
2.1.2 Rotor Assembly 4 parts + deeper › rotor-assembly 1× 1 19 assembly
2.1.3 Encoder encoder 1× 1 · part
2.1.4 Motor Housing motor-housing 1× 1 · part
2.2 Ball Bearing ball-bearing 2× 2 · part
2.3 Blower Impeller galvanizing-line-blower-impeller 1× 1 · part
3 Knife Positioner 3 parts galvanizing-line-knife-positioner 1× 1 52 assembly
3.1 Ball Screw ball-screw 2× 2 · part
3.2 Servo Motor 4 parts servo-motor 2× 2 24 assembly
3.2.1 Stator Assembly 3 parts + deeper › stator-assembly 1× 2 3 assembly
3.2.2 Rotor Assembly 4 parts + deeper › rotor-assembly 1× 2 19 assembly
3.2.3 Encoder encoder 1× 2 · part
3.2.4 Motor Housing motor-housing 1× 2 · part
3.3 Linear Guide Rail linear-guide 2× 2 · part
4 Coating Weight Gauge 3 parts galvanizing-line-coating-gauge 1× 1 3 assembly
4.1 Bare PCB pcb-bare 1× 1 · part
4.2 Microcontroller mcu 1× 1 · part
4.3 Gauge Source Head galvanizing-line-gauge-source 1× 1 · part
5 Edge Baffle galvanizing-line-edge-baffle 2× 2 · part

Something wrong in this list? Report a problem with this BOM.

Where the air knife section is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks