BOMwiki the bill-of-materials encyclopedia
30,441,950 parts mapped · 192,925 items

This page is machine-generated and unverified (what this means). Treat details as provisional. If you know this hardware, weigh in or correct it directly with Edit.

Discussion History

Cooling Tower

Assembly

Tall tower above the air knives where forced air freezes the wiped coating before any roll touches it, so the soft zinc is not marked. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Cooling Tower parts and their functions

4 top-level parts · 182 parts in total · full bill of materials below
Cooling Tower parts diagram: 1 air cooling box, 2 tower cooling fan, 3 top deflector roll, 4 cooling tower frame. 182 parts in 4 assemblies.
Cooling Tower parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Air Cooling Box 2 parts Air cooling boxes along the strip pass
2 Tower Cooling Fan 2 parts Fans driving cooling air over the strip
3 Top Deflector Roll Top deflector roll turning the strip down
4 Cooling Tower Frame Tower structure and access platforms

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Cooling Tower

4 top-level lines · 14 rows shown · 182 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Air Cooling Box 2 parts galvanizing-line-cooling-box 4 32 assembly
1.1 Drying Air Nozzle galvanizing-line-air-nozzle 24 · part
1.2 Cooling Gas Fan 2 parts galvanizing-line-cooling-fan 4 26 assembly
1.2.1 Servo Motor 4 parts + deeper › servo-motor 4 24 assembly
1.2.2 Ball Bearing ball-bearing 8 · part
2 Tower Cooling Fan 2 parts galvanizing-line-tower-fan 2 26 assembly
2.1 Servo Motor 4 parts servo-motor 2 24 assembly
2.1.1 Stator Assembly 3 parts + deeper › stator-assembly 2 3 assembly
2.1.2 Rotor Assembly 4 parts + deeper › rotor-assembly 2 19 assembly
2.1.3 Encoder encoder 2 · part
2.1.4 Motor Housing motor-housing 2 · part
2.2 Ball Bearing ball-bearing 4 · part
3 Top Deflector Roll galvanizing-line-tower-deflector 1 · part
4 Cooling Tower Frame galvanizing-line-tower-frame 1 · part

Where the cooling tower is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks