BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Take-Off and Cooling

Assembly

Take-off rolls and cooling drums setting the sheet before wind-up. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Take-Off and Cooling parts and their functions

6 top-level parts · 17 parts in total · full bill of materials below
Take-Off and Cooling parts diagram: 1 take-off roll, 2 cooling drum, 3 cooling festoon, 4 take-off motor, 5 dancer roll, 6 ball bearing. 17 parts in 6 top-level items.
Take-Off and Cooling parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Take-Off Roll 2× Take-off draw rolls
2 Cooling Drum 4× Water-cooled cooling drums
3 Cooling Festoon 1× Festoon accumulator for cooling dwell
4 Take-Off Motor 1× Take-off drive motor
5 Dancer Roll 1× Dancer roll holding line tension
6 Ball Bearing 8× Drum and roll bearings

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Take-Off and Cooling

6 top-level lines · 6 rows shown · 17 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Take-Off Roll rubber-calender-takeoff-roll 2× 2 · part
2 Cooling Drum rubber-calender-cooling-drum 4× 4 · part
3 Cooling Festoon rubber-calender-festoon 1× 1 · part
4 Take-Off Motor rubber-calender-takeoff-motor 1× 1 · part
5 Dancer Roll rubber-calender-dancer 1× 1 · part
6 Ball Bearing ball-bearing 8× 8 · part

Something wrong in this list? Report a problem with this BOM.

Where the take-off and cooling is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks