BOMwiki the bill-of-materials encyclopedia
30,441,950 parts mapped · 192,925 items

This page is machine-generated and unverified (what this means). Treat details as provisional. If you know this hardware, weigh in or correct it directly with Edit.

Discussion History

Entry Accumulator

Assembly

Vertical looping tower that stores a long reserve of strip so the welder can stop the entry end while the furnace and pot keep running at constant speed. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Entry Accumulator parts and their functions

5 top-level parts · 60 parts in total · full bill of materials below
Entry Accumulator parts diagram: 1 accumulator carriage, 2 loop roll, 3 carriage hoist drive, 4 accumulator tower, 5 ball bearing. 60 parts in 5 assemblies.
Entry Accumulator parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Accumulator Carriage Movable carriage carrying the loop rolls
2 Loop Roll Idler rolls forming the strip festoon
3 Carriage Hoist Drive 3 parts Hoist drive raising and lowering the carriage
4 Accumulator Tower Structural tower guiding the carriage
5 Ball Bearing 16× Loop roll bearings

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Entry Accumulator

5 top-level lines · 16 rows shown · 60 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Accumulator Carriage galvanizing-line-accumulator-carriage 1 · part
2 Loop Roll galvanizing-line-loop-roll 8 · part
3 Carriage Hoist Drive 3 parts galvanizing-line-carriage-drive 1 34 assembly
3.1 Helical Gearbox 4 parts gearbox 1 9 assembly
3.1.1 Helical Gear Pair gear-pair 2 · part
3.1.2 Gearbox Housing gearbox-housing 1 · part
3.1.3 Ball Bearing ball-bearing 4 · part
3.1.4 Oil Seal oil-seal 2 · part
3.2 Servo Motor 4 parts servo-motor 1 24 assembly
3.2.1 Stator Assembly 3 parts + deeper › stator-assembly 1 3 assembly
3.2.2 Rotor Assembly 4 parts + deeper › rotor-assembly 1 19 assembly
3.2.3 Encoder encoder 1 · part
3.2.4 Motor Housing motor-housing 1 · part
3.3 Drive Belt drive-belt 1 · part
4 Accumulator Tower galvanizing-line-accumulator-tower 1 · part
5 Ball Bearing ball-bearing 16× 16 · part

Where the entry accumulator is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks